USCG Anthony Petit

Bay Power sent 3 of their veteran technicians to Ketchikan Alaska to perform 3 center section & top end overhauls simultaneously, including main bearings, cylinder packs, heads, front & rear seals and cam bearings. Performed a 4-hour load bank test on each generator. The CGC is a 175-foot vessel that maintains aid to navigation and conducting multiple Coast Guard missions within the coastal waters of Southeast Alaska. This overhaul took less than a month to complete.

USCGC Anthony Petit